Licensed GC CGC1541486 · Tampa
Tampa kitchen & bath remodeling
Tampa's trusted remodeling experts. A few quick questions and about forty seconds get you a real price range, built from jobs we've actually done.
Free · About forty seconds
What will your project cost?
Most Tampa contractors won't publish prices. We do. Answer a few quick questions and see your real range, built from jobs we've actually done.
Not ready for a number? See what 11 real Tampa jobs came to — final invoices, not averages.
Full guides: kitchen remodel cost in Tampa,bathroom remodel cost,microcement cost.
An estimate, not a quote — your price is set after our free walkthrough.
Start here—running estimate
A few quick questions, then your range.
Photographed on finished Tampa jobs
See every projectInside our recent work
















Why Ceballos
Why homeowners choose Ceballos Contracting
5.0 from 30 Google reviewsCeballos Contracting is a family-owned, licensed general contractor in Tampa. Eric Ceballos started the company and still runs it. In this one-minute video he explains why, and what you can expect when his crew is working in your home.
5.0 · 30 Google reviews
Read all reviewsWhat Tampa homeowners say
★★★★★
The quality of the tile work was excellent, and I’ve already decided to hire Ceballos again for hardwood flooring in the rest of my home.
★★★★★
Eric and his team CRUSHED our project, super reliable team, always open communication. If you need your project taken care of in Tampa, call them!
★★★★★
We hired Ceballos Contracting to remodel our bathroom and it was nothing short of a 5 star experience! They were reliable, timely, priced very fair, and the work was premium!
Swipe for more →
Quick answers from Eric
Remodeling questions, answered
Short videos on what homeowners ask before they hire anyone: what's worth the money, when you need a designer, and what it really costs.
Swipe for more →
Still wondering what it costs?A few questions. About forty seconds.
A few questions. About forty seconds.
A real Tampa number.
Based on what we actually charge, not a national average.
Build & price my projectHow it goes
Five steps, and you know what happens in each
No mystery, no surprise invoices. This is the whole thing, start to finish.
01
The walkthrough
Free, about 45 minutes, at your home.
We measure, listen, and leave you with a real range the same day. No deposit, no obligation. If your budget and the project don't line up, we'll tell you in the driveway rather than after you've spent three weeks waiting on a proposal.
02
A proposal you can compare
Allowances written in dollars, not as “standard grade”.
Permit, demolition and haul-off appear as their own line items, so you can put our number beside anyone else's and see what's actually in each. A low allowance is how a $30,000 bid becomes a $46,000 invoice at the tile shop.
03
Permits and plan review
We pull them. You don't chase anyone.
City of Tampa or Hillsborough County depending on where you live, plus the inspections that follow. Plan review typically takes one to three weeks, and the cost is a line in your proposal rather than a surprise.
04
The build
The same crew, every day, for the whole job.
We set up a temporary kitchen on day one so most clients stay in the house. If we open a wall and find something nobody could have seen, you get a written change order with the cost and the added days before we touch it. No verbal change orders, ever.
05
Handover
Final walkthrough, punch list, done.
We walk the finished room with you and write down anything that isn't right. Inspections signed off, permits closed, and the space handed back clean.
Services
Explore all servicesWhat we build
Kitchens and baths are most of what we do. Here's the rest.

Kitchen Renovations
Modern, functional, and built to impressView service
Bathroom Remodeling
Spa-inspired designs for daily luxuryView service
Full-Home Remodeling
Transform every room with one seamless visionView service
Exterior & Patio Builds
Extend your space beyond the wallsView service
Interior Upgrades & Finish Work
Details that make the differenceView service
Microcement & Surfaces
Sleek, seamless, and built for modern livingView serviceRadical transparency
Why we're rarely the cheapest quote
If someone bids your kitchen $18,000 under us, one of these three is missing from their number. Ask them which.
The permit
$400 – $1,400City of Tampa or Hillsborough County, plan review, and the inspections that follow. A bid without it means unpermitted work, and that surfaces when you sell the house.
Demo and haul-off
$1,800 – $4,500Tearing it out, dumpsters, disposal. Often quietly left as your problem, then billed as a change order in week two.
Real allowances
VariesWe write allowances in dollars, not as "standard grade." A low allowance is how a $30,000 bid becomes a $46,000 invoice at the tile shop.
FAQs
All FAQsThe questions homeowners ask
How much does a kitchen remodel cost in Tampa?
Most of ours land between $35,000 and $65,000. A cosmetic refresh on an unchanged layout can come in under $25,000. Custom cabinetry, moved plumbing, or removing a wall pushes past $70,000. The estimator will give you a range for your specific project in about forty seconds.
How much does a bathroom remodel cost?
A powder room starts around $4,000. A guest bath typically runs $11,000 to $19,000. A full master with a custom shower usually lands between $19,000 and $30,000. Finish level moves that number more than square footage does.
Why are you more expensive than the guy who quoted me $22,000?
Usually because his number is missing three lines: the permit, demolition and haul-off, and a real materials allowance instead of a placeholder. Ours shows all three separately so you can compare like with like. Sometimes the cheaper bid is genuinely the right call — but you should know what's in it before you sign.
What permits do I need, and do you handle them?
Kitchen and bath remodels involving plumbing, electrical, or structural work require permits from either the City of Tampa or Hillsborough County depending on where you live. We pull them, schedule the inspections, and the cost appears as a line item in your proposal. Plan review typically takes one to three weeks.
How long will my kitchen be out of commission?
Six to ten weeks for most Tampa kitchens. Ten to sixteen if you've chosen custom cabinetry, since lead times drive the schedule more than the labor does. We'll give you a realistic date before demolition starts, not an optimistic one.
About us
More about usThe people who'll actually be in your house
We do a small number of projects at a time on purpose. Your project manager knows your name, your foreman knows your dog's name, and you're never wondering who's showing up in the morning.




No cost, no obligation
Book the free walkthrough
About 45 minutes, at your home. We measure, talk through the options, and you get a range before we leave.

